Load the Schedule Unit Details Section Load the base unit that you want to be added as a scheduled unit.
If a base unit is already an existing one, refer to this instruction on how to search for a base unit in Paradigm: https://silverband.atlassian.net/wiki/spaces/PKB/pages/984668/Search+Add+and+Edit+Base+Units#1.-How-to-search-for-a-Base-Unit. If a base unit has not been created and added to the system, refer to these guides on how to add a new base unit in Paradigm: HE: https://silverband.atlassian.net/wiki/spaces/PKB/pages/984668/Search+Add+and+Edit+Base+Units#2.-How-to-create-or-add-a-New-Base-Unit-(Higher-Education) VET: https://silverband.atlassian.net/wiki/spaces/PKB/pages/984668/Search+Add+and+Edit+Base+Units#3.-How-to-create-or-add-a-New-Base-Unit-(VET) If the base unit is the one that is currently loaded in the system, procced to the instructions. Load the schedule unit details page.
Once the base unit is already loaded, you are now ready to add it as a scheduled unit in the system by following the instructions below. , Choose Units > Scheduled Unit Details menus on the side. Click the required option under the Scheduled Unit Details sub-menu: Add Scheduled , should be selected to add a new scheduled unit. All these other menus can only be used after adding the base unit as a scheduled unit: Edit Scheduled, Sessions, Student Results, Reschedule Units, Schedule Assessments, Bulk Edit Scheduled Fee, Bulk Session Enrol. Refer to the Key Terms and Conceptssection above for a brief description of each sub-menu. Continue to this next article on how to Search, Add, and Edit Scheduled Units in Paradigm: Search, Add and Edit Scheduled Units. back to top |